Model No
Drill Pipe - T3/TH60 & T4 & RD20 Style
Description
Ingersoll-Rand / Atlas Copco & Schramm & Gefco Style Drill Pipe - Pre-Ordered:
New T3/TH60 Drill Pipe (20' X 4 1/2" OD X 3 1/2" or 2 7/8" IF or Regular)
New T3/TH60 Drill Pipe (20' X .368 OD X 2 3/8" IF & Regular)
New T4 Drill Pipe (25' X 4 1/2" OD X 3 1/2" or 2 7/8" IF or API)
New T4 Drill Pipe (25' X .368 OD X 2 3/8" IF & API)
New T4 Drill Pipe (25' x 5-1/2" OD) BH drilling pipe
New RD20 / T130 style Drill Pipe (30' X 4 1/2" OD X 3 1/2" or 2 7/8" IF or Regular)
Note: Steel or Aluminum grade options - note: Aluminum is lighter but cost more
Note: Tube is a Grade D., alloy is 4140/4155 heat treated and quench tempered is the standard
Note: (110) at 20'x4-1/2" OD or (100) at 25'x4-1/2" OD and (90) at 30'x4-1/2" OD drill pipe max can be loaded in a 40' ft container. If 3-1/2" OD then more can be loaded depending on length & total weight allowed.
Note: Leadtime ranges from 4-8 weeks depending on materials being available
Manufactured in Eastern Region, USA (Made in the USA)
DTH drill pipes specifications |
Outer diameter |
Thread |
|
|
Wall thickness |
Length |
mm |
inch |
mm |
mm |
76 |
3 |
FEDP (Failing connection)
Mayhew Junior
Mayhew Regular
API 2 3/8" REG
API 2 7/8" REG
API 3 1/2" REG
API 4 1/2" REG
API 6 5/8" REG
API 2 3/8" IF
API 2 7/8" IF
API 3 1/2" IF
API 4 1/2" IF
3 1/2" BECO
4 1/2" BECO
5 1/4" BECO
6" BECO
8" BECO
10" BECO
12" BECO |
4 |
1000-6000 |
6.3 |
89 |
3 1/2 |
4 |
1000-6000 |
6.3 |
8.8 |
102 |
4 |
6.3 |
4000-6000 |
8.8 |
114 |
4 1/2 |
6.3 |
4000-9000 |
12.5 |
127 |
5 |
6.3 |
4000-9000 |
12.5 |
19 |
133 |
5 1/4 |
6.3 |
4000-9000 |
12.5 |
19 |
140 |
5 1/2 |
8.8 |
4000-9000 |
12.5 |
19 |
Quality warranty:
Our products are made of high quality steel and all spares parts are inspected strictly before shipping. We have quickly responses for your complaint and suggestion.
Package:
Using ply-wooden cases and pallet for package to protect the products and avoid the damagement during transportation. Also we can customize package according to your special requests.
Production time:
Generally need 10-15 days
Transportation:
By air, By Express or By sea according to your requests.